1.1.2 Shift Rounds and Flow Records

বাংলায় পড়ুন

A useful shift log lets the next operator reconstruct what happened without guessing. Begin with the previous handover, then walk the approved route from the inlet to the outlet. Ask production about upcoming batches or cleaning discharges that could change the load.

Shift B timeline from 08:00 to 16:00 with a high-level alarm at 15:20, a 760 cubic meter inlet total, and a pending outlet sample.
One timeline brings together the totalizer, the EQ alarm, and the pending sample.

Read the plant in three moments

  • Start. Confirm the active train, duty and standby equipment, EQ level, open alarms, isolations, and pending tests.
  • During the shift. Log the time, point or asset ID, units, and what changed. Compare meter readings at the same point. Verify an unexpected reading before acting on it.
  • Handover. State what the team did, what remains open, who owns it, and when to check again. Keep the status of any hold or release decision explicit.

A shift at ET-01

The inlet totalizer moves from 10,000 to 10,760 m³ between 08:00 and 16:00. That is 760 m³ over 8 hours, or 95 m³/h on average. A separate final-outlet meter has its own record. At 15:20, the EQ high-level alarm appears. The operator records the alarm, verifies the available buffer through the site procedure, and alerts the shift lead. The outlet sample result is still pending at handover. Those two facts belong on separate lines so the next shift can follow each one.

‹ Previous lesson · Chapter contents · Next lesson ›